Song Da Consultancy signs 17b dong surveying contract for two hydropower plants
Song Da Consultancy Joint Stock Co (coded SDC) announced to sign the consulting contract No 12/2010/HD-TDSD-SDCC with Song Da Group on August 9, 2010.
Accordingly, SDC will take responsibility for conducting survey for construction conditions of two hydropower projects of Se Kong 3A and Se Kong 3B in technical designing phase.
The contract will last from July 2 to December 31, 2010.
The total value of the contract is estimated at 17 billion dong.
Tags: Se Kong 3A hydropower plant, Se Kong 3B hydropower plant