Cam Pha thermo power plant No 1&2 officially handed over

The China-based Harbin International Power Engineering Co Ltd yesterday September 15, 2011 officially handed over the two thermo power plants of Cam Pha 1 and Cam Pha 2 to Cam Pha Thermo Power Joint Stock Co, under Vietnam Coal and Mineral Industries Group (Vinacomin).
The construction works on these two thermal power plants officially started in April 2006. Harbin International Power Engineering Co Ltd was the main contractor for these projects.

The supervisors were Fichtner GMBH Co and Co.KG Stuttgart, Germany in association with Vietnam Power Engineering Consulting Co No 1 (Vneco1). The two power plants have total designed capacity of 680 MW. These projects have investment capital of 10.635 trillion dong.

After over one year in operation, the two thermo power plants have been in stable operation, supplying over 4 billion KWh to the national grid so far.

In 2011, Cam Pha Thermo Power Joint Stock Co set targets to reach 3.72 billion KWh.

Tags:

Posted by VBN on Sep 17 2011. Filed under Energy. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

You must be logged in to post a comment Login

Stay informed everyday

Subscribe to free RSS and email updates from Vietnam Business News

Subscribe via Email Subscribe in a Reader Follow us on Twitter Connect on Facebook

RSS China Business News

  • Gold to retest $1920 mark
  • China’s yuan hits new high against USD Wednesday
  • Yuan funds outstanding for foreign exchanges surge in August
  • Hot money boils up banks’ foreign capital
  • ‘Technical rebound’ sends stocks up again
  • Red chips would flock international board
  • Funds outstanding for foreign exchanges surge in Aug
  • ChiNext Index closes up – Sept 21

Sponsored

  • Looking for an overseas forex broker?
  • Trading Point now offering Forex Malaysia and FX Japan with Forex, CFD's and Futures.