Vietnam to study seismic risk at nuclear plant site

Vietnam’s science and technology ministry has ordered a fresh study of the site where the country’s first nuclear power station is supposed to be built after scientists warned there was an earthquake and tsunami risk, a newspaper reported on Thursday.

The coastal site of the Ninh Thuan 1 and 2 plants, the first of which is scheduled to start production in 2020, was found to be within 80-100 km (50-62 miles) of a fault line, newspaper Thanh Nien reported.

The study will run until 2013 and look at all the risks associated with the fault “to make an evaluation for the basis of the choice of construction site”, it said.

It quoted deputy minister Le Dinh Tien as saying the study was necessary to ensure the safety of the plants.

Construction of the two-reactor power station in the south-central province of Ninh Thuan is expected to start in 2014. It will use Russian technology.

Tags:

Posted by VBN on Aug 19 2011. Filed under Energy. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

You must be logged in to post a comment Login

Stay informed everyday

Subscribe to free RSS and email updates from Vietnam Business News

Subscribe via Email Subscribe in a Reader Follow us on Twitter Connect on Facebook

RSS China Business News

  • Jewelers suffer from high gold prices
  • Venezuela bans gold exports; state to hold 55% in mining ventures
  • Swiss stock exchange bets on gold
  • 64,750 a good level to enter silver market: Viral Shah, Geojit Comtrade
  • High price a boost for gold movement through Dubai
  • ‘Silver is the investment of the next decade’
  • India gold jewelry buying to gain momentum from October
  • Gold price technical analysis indicating “watch out” time for gold

Sponsored

  • Looking for an overseas forex broker?
  • Trading Point now offering Forex Malaysia and FX Japan with Forex, CFD's and Futures.